Media Centre

View our Case Studies

Toneway Junction: The Road to High Capacity

ACO provides an optimised drainage solution that still catered for the high-capacity requirements present within an urban highway environment.

Download PDFVIEW WEB PAGE
Wildlife Climate Tunnel Castle Hill
ACO Wildlife Climate Tunnel provides perfect ecological solution at Castle Hill project in Ebsfleet Valley

ACO Climate Tunnels were specified in order to support the ethos of the new Garden city and protect the local wildlife

Download PDF
Perth and Kinross
ACO Wildlife Kerb prevents amphibians from falling down roadside gullies

A safe and sustainable solution to prevent amphibians being trapped in roadside gullies in Perth and Kinross

Download PDF
A453
ACO KerbDrain provide fast, efficient drainage along various points of the A453 newly widened carriageway.

With design and cost a major consideration for this project, ACO worked with both the engineer and contractor to ensure targets were met.

Download PDF
Layton District Blackpool
ACO KerbDrain & RoadDrain help alleviate sustainability threatened by traffic & safety barriers in Blackpool.

ACO KerbDrain and ACO RoadDrain create a 'shared space' demarking boundaries between pedestrian walkways and vehicle carriageways.

Download PDF
Top